Medical
Teton Dental

Teton Dental

projectTeton Dental The main HVAC system was located on the outside of the building with the main supply and return ductwork entering the building by penetrating dormers on the sloped roof.Details Client: Marasco  Project Type: Medical Location: Idaho Falls, Idaho...

Century Farms

Century Farms

projectVeranda Senior Living Center at Century Farms Nurse Call, Portable Generator.Details Client: Babcock Design Idaho Completion: Jan 2019 Project Type: Medical Location: Meridian, Idaho Size: 65,000 sq ft Services Provided: Complete Electrical DesignLet's Build...

Specialty Orthopedic ASC

Specialty Orthopedic ASC

projectSpecialty Orthopedic ASC Medical imaging suite, physical therapy pool, physical therapy suite, four operating rooms, Type 1 essential electrical system.Details Client: Marasco and Associates Completion: Mar 15, 2019 Project Type: Medical Location: Tupelo,...

Sentiel Gastro Engerology ASC

Sentiel Gastro Engerology ASC

projectSentiel Gastro Engerology ASC Four operating rooms,  AAAHC certified, Type 1 essential electrical system.Details Client: Marasco and Associates Completion: June 18, 2021 Project Type: Medical Location: Missoula, MT Size: 17,915 sq ft Services Provided:...

Tooele Medical Clinic

Tooele Medical Clinic

projectTooele Medical Clinic This project was an office tenant improvement with 6 private offices for a medical clinic accounting department. This project also included a single dental exam room tenant improvement.Details Client: Alder Electric Completion: 2019...

Davenport Dental

Davenport Dental

projectDavenport Dental This project was a 7,800 sf dental office with 17 operatories. The dental office included a panoramic x-ray machine and 8 operatories were equipped for local x-rays. Thorough coordination with the dental equipment supplier was critical to...

Ambulatory Surgical Center

Ambulatory Surgical Center

project10-mile MOB /Ambulatory Surgical Center 4-level medical office bldg (150k sf) from which 20k sf was a surgical center on level 1. MOB mechanical infrastructure was air-cooled VRF (all except ASC area). ASC mechanical system: (1) dedicated AHU for the surgical...